Miami Design-Build Process: From Permit to Certificate of Occupancy
- Layma Balaguer

- Jan 6
- 3 min read
Understanding how the design-build process works in Miami can help property owners avoid delays, budget overruns, and permitting surprises.
Miami construction is not the same as construction in most U.S. cities. Permitting timelines, code requirements, flood zones, and inspection sequencing all impact cost, schedule, and risk.
This guide explains how the design-build process works specifically in Miami, what to expect at each phase, and where most projects encounter delays or cost overruns. It’s written for property owners, developers, and business owners planning residential or commercial projects in Miami-Dade County.

What the Miami Design-Build Process Really Means
Design-build is a delivery method where architecture, engineering, and construction are coordinated under one team.
In Miami, this approach is especially valuable because:
Permitting is complex and jurisdiction-specific
Structural, flood, and wind load requirements are strict
MEP coordination frequently drives revisions
Scope clarity early prevents costly change orders later
Instead of separate designer and contractor silos, design-build creates one coordinated process from concept to completion.
Phase 1: Pre-Design & Feasibility
This phase determines whether a project is viable before significant money is spent.
Typical tasks include:
Budget range validation
Code and zoning review
Flood zone and site constraints
Initial program and scope definition
Early constructability input
In Miami, skipping this step often leads to:
Permit denials
Underestimated budgets
Major mid-project redesigns
Phase 2: Design & Engineering
Once feasibility is confirmed, the project moves into full design.
This includes:
Architectural drawings
Structural engineering (wind, flood, foundation)
Mechanical, electrical, and plumbing design
Energy calculations and local code compliance
Design-build teams coordinate these disciplines in parallel, which reduces conflicts and speeds up permit responses.
Phase 3: Permitting & City Review
Permitting is where most Miami projects slow down.
Common realities:
Multiple review cycles are normal
Zoning, building, fire, and utilities review separately
Revisions are often triggered by coordination issues, not mistakes
Design-build helps here by:
Anticipating review comments
Responding quickly with coordinated revisions
Preventing trade conflicts that force redesign
Permit timelines vary widely depending on jurisdiction and scope, but clarity and coordination consistently reduce delays.
Phase 4: Pre-Construction Planning
Before physical work begins, critical planning happens.
This includes:
Finalizing scope and allowances
Sequencing trades and inspections
Material lead time coordination
Temporary utilities and site logistics
This phase is where a realistic construction schedule is set.
Phase 5: Construction
Construction is executed in controlled phases:
Demolition and site preparation
Structural work and framing
MEP rough-ins
Inspections
Drywall and finishes
Final fixtures and trim
In Miami, inspection timing and trade coordination matter more than speed.
Rushing work often causes re-inspections and delays.
Phase 6: Final Inspections & Certificate of Occupancy
The project is not complete until:
All final inspections pass
Punch list items are resolved
Close-out documents are submitted
The Certificate of Occupancy (or Completion) is issued
Design-build teams manage this process to ensure nothing is missed at the end, where delays are most costly.
Common Mistakes in Miami Design-Build Projects
Property owners frequently encounter problems due to:
Incomplete permit sets
Unrealistic budgets
Missing scope assumptions
Poor MEP coordination
Misunderstanding inspection sequencing
Most issues can be avoided when design, engineering, and construction are aligned early.
Why Design-Build Is Well-Suited for Miami
Miami projects demand:
Strong coordination
Code awareness
Realistic budgeting
Tight scope control
Design-build is not about cutting corners. It’s about reducing risk, avoiding surprises, and delivering projects that pass inspection without unnecessary delays.
Frequently Asked Questions
Is design-build more expensive?
Not typically. While design-build may appear higher upfront, it often reduces total project cost by eliminating redesigns, delays, and change orders.
Can design-build work for commercial projects?
Yes. It is commonly used for commercial build-outs, retail spaces, offices, and mixed-use projects in Miami.
Do permits still take time with design-build?
Yes. Design-build does not eliminate city review, but it improves response speed and coordination.
Every Miami project is different. Budget, zoning, flood requirements, and scope all affect how the design-build process should be structured.
Understanding the process before starting is one of the most effective ways to reduce risk and protect your investment.